大鸡巴日大鸡巴,日韩av电影在线不卡观看,5060午夜鲁鲁鲁鲁鲁,337P人体粉嫩胞高清

NEWS

Great news
Click Online Message

TEL:0391-5299981

EMAIL:qyyangnan@vip.163.com

ADDRESS:South Section of Taihang Avenue, QinYang

Industry news
Great news
Home > Juli News > Industry news

Problems in the coiling machine industry

Release time:2013-12-03 09:40:01 Source of the article:qyjljc Number of clicks:2415

  Although the integration of the two-roller industry in China has achieved certain results, there are still many shortcomings. Specifically, there are four aspects:

  First, the production management concept is backward, and the application level of information technology in the manufacturing process is low. At present, the production methods and management concepts of enterprises in China's coiling machine industry are generally backward. The lack of motivation and conditions for enterprises to develop the informationization of manufacturing and manufacturing links has made the level of integration of manufacturing links become the bottleneck for the production of boilers and production products. .

  Second, the ability of comprehensive collaborative innovation is insufficient. According to the results of the two-integration assessment, the current informationization single application of the enterprise in the coiling machine industry is generally good, and the information integration application has a certain scale and level, but the level of integrated integration, coordination and innovation between information systems needs to be improved. . Among them, smaller enterprises are more difficult to achieve comprehensive integration and synergy and innovation due to constraints such as late start, insufficient basic investment, and unregulated management.

  Third, the lack of information systems to meet the needs of the industry. The information system is the basis of the two-in-one integration of enterprises. At present, there is a lack of information systems suitable for the coiling machine enterprises in the market, which makes the integration of the two technologies often less than half the effort, and it is difficult to achieve the expected goals.

  Fourth, the industry standards are lagging behind, and the degree of integration of the two technologies is insufficient. The informatization construction standards suitable for the coiling machine industry are of great significance to the regulation of industry enterprises and the in-depth implementation of the integration of the two. At present, there is no unified standard of informationization in China, and the coiling machine industry lacks the applicable two-in-one integration standard. This causes the coiling machine enterprises to adopt different modeling standards and business process specifications in individual system applications, so that each Data exchange, convergence and collaborative integration between systems are difficult.



  • PHONE
  • message
    MESSAGE
  • map
    MAP
  • ewm
    QR CODE
  • 镇平县| 峨眉山市| 界首市| 桑日县| 台湾省| 浮梁县| 大同市| 贵溪市| 资源县| 吉隆县| 东乌| 东阳市| 韶山市| 泸西县| 涿州市| 洛川县| 邛崃市| 宜丰县| 黑河市| 凉城县| 喀喇沁旗| 陕西省| 安庆市| 扎鲁特旗| 泸西县| 上虞市| 临泽县| 常德市| 木里| 抚顺市| 衡南县| 武宣县| 临泽县| 莎车县| 庆安县| 安阳县| 仙居县| 松桃| 神木县| 会同县| 泰和县|