大鸡巴日大鸡巴,日韩av电影在线不卡观看,5060午夜鲁鲁鲁鲁鲁,337P人体粉嫩胞高清

NEWS

Great news
Click Online Message

TEL:0391-5299981

EMAIL:qyyangnan@vip.163.com

ADDRESS:South Section of Taihang Avenue, QinYang

Juli News
Great news
Home > Juli News

Bending machine operating rules

Release time:2018-07-17 14:24:50 Source of the article:qyjljc Number of clicks:1424

  1. Check whether the mechanical properties are good, the workbench and the bending machine table are kept level; and prepare various mandrel tool stops.

  Second, according to the diameter of the processed product and the requirements of the bending machine, the mandrel, the forming shaft, the iron retaining shaft or the variable retaining frame are installed, and the diameter of the mandrel should be 2.5 times the diameter of the product.

  Third, check the mandrel, the block, the turntable should be free from damage and cracks, the protective cover is fast and reliable, and it can be operated only after the operation of the empty machine is confirmed.

  4. When working, insert one end of the product into the gap where the turntable is fixed. The other end of the bending machine is fixed against the fuselage and pressed by hand. Check that the fuselage is fixed and it is safe to block the side of the product. start.

  5. It is strictly forbidden to replace the mandrel, change the angle and speed control during the operation, and do not add or remove oil.

  6. When bending products, it is strictly forbidden to process the diameter, number of roots and mechanical speed of the product exceeding the mechanical specifications.

  VII. When bending high hardness or low alloy products, the standard diameter should be changed according to the mechanical nameplate and the corresponding mandrel should be exchanged.

  8. It is strictly forbidden to stand in the working radius of the curved product and on the side where the fuselage is not fixed. The bent semi-finished products should be stacked neatly and the hooks must not face upwards.

  9. When the turntable is reversed, it must be carried out after stopping.

  Ten, the operation is completed, the site is cleaned, the machinery is maintained, and the lock box is turned off.



  • PHONE
  • message
    MESSAGE
  • map
    MAP
  • ewm
    QR CODE
  • 澳门| 景宁| 迁安市| 赤峰市| 富阳市| 射阳县| 鄂尔多斯市| 随州市| 南丹县| 社旗县| 高雄市| 滦南县| 苏尼特右旗| 刚察县| 鲜城| 龙胜| 行唐县| 乌鲁木齐市| 徐水县| 泾川县| 宜州市| 芦溪县| 巍山| 陆川县| 偏关县| 当阳市| 化德县| 弥勒县| 临泽县| 独山县| 固始县| 龙陵县| 巴马| 西平县| 玛多县| 宝山区| 嘉鱼县| 张家界市| 临邑县| 衡阳县| 桐城市|